✓KymiraCertified BI
Operations / Lean

WIP Aging / Dwell

How long the unfinished work on the floor has been sitting there, the age of stuck jobs, which points straight at flow problems and stale inventory.

The fork, why two teams get different numbers

The first fork is what you age.

In the Metric LibraryGet the Metric Library Start with the free skill · see a live certified report

Reference: APICS/ASCM WIP & inventory-aging convention · Lean flow metrics · GAAP lower-of-cost-or-NRV (ASC 330)